Resource Type

Journal Article 106

Conference Videos 4

Year

2023 5

2022 7

2021 8

2020 4

2019 5

2018 3

2017 3

2016 4

2015 5

2014 9

2013 3

2012 5

2011 4

2010 8

2009 8

2008 7

2007 9

2005 2

2002 2

2001 3

open ︾

Keywords

Antenna-in-package (AiP) 2

Baosteel 2

Low temperature co-fired ceramic (LTCC) 2

Meander line antenna 2

Multi-chip module (MCM) 2

boundary line analysis 2

chemotherapy 2

metro construction 2

20 kt-level combined heavy-haul train 1

32 m box girder 1

3D measurement 1

In-situ laser machining 1

Air-to-ground channel 1

All-pass waveguide 1

BIM 1

BPA 1

Balanced bandpass filter (BPF) 1

Bay 11-7082 1

Cascading failures 1

open ︾

Search scope:

排序: Display mode:

Metro train rescheduling by adding backup trains under disrupted scenarios

Jiateng YIN, Yihui WANG, Tao TANG, Jing XUN, Shuai SU

Frontiers of Engineering Management 2017, Volume 4, Issue 4,   Pages 418-427 doi: 10.15302/J-FEM-2017044

Abstract: In large cities with heavily congested metro lines, unexpected disturbances often occur, which may causeMetro dispatchers have taken a practical strategy of rescheduling the timetable and adding several backup

Keywords: train rescheduling     backup train     metro line     disruption     timetable    

The Undersea Tunnel on Qingdao Metro Line 8

Weiguo He, Peng Liu

Engineering 2018, Volume 4, Issue 2,   Pages 167-169 doi: 10.1016/j.eng.2018.03.012

A review of metro construction in China: Organization, market, cost, safety and schedule

Lieyun DING, Jie XU

Frontiers of Engineering Management 2017, Volume 4, Issue 1,   Pages 4-19 doi: 10.15302/J-FEM-2017015

Abstract: China is now in an era of large-scale metro construction.This paper reviews the nature of Chinese metro engineering with a specific focus on its organizationThen, an examination on recent research in metro engineering of the National Natural Science Foundation

Keywords: metro engineering     construction status     construction challenges     NSFC    

A Discussion on Some Critical Issues of Metro Network Planning

Quan Yongshen

Strategic Study of CAE 2000, Volume 2, Issue 4,   Pages 75-82

Abstract:

Many cities in China are now experiencing the booming period of metro construction.A critical and urgent problem is how to work out a sound network planning for the metro system beforethe concrete line implementation.Based on the experiences of metro network planning in China these years, the paper intends to exploreplanning and the integration of the metro system with other public transport systems in the city.

Keywords: metro     network planning    

Evaluation of stray current corrosion resistance of concrete in metro construction

YANG Shucai, YANG Xu

Frontiers of Structural and Civil Engineering 2008, Volume 2, Issue 3,   Pages 246-252 doi: 10.1007/s11709-008-0036-4

Abstract: water to binder ratio, and the service life of such kind of concrete meets the basic requirement of a metro

Keywords: project     different     requirement     simulation     capability    

On Reducing Investments of Metro Construction in China

Shi Zhongheng

Strategic Study of CAE 2001, Volume 3, Issue 1,   Pages 36-39

Abstract: reliable in safety, economical in investment and practical in functions, the possibilities for reducing metroconstruction costs are analysed, and the following tentative suggestions for reducing metro constructionconstructing; paying great attention to passenger number forecast, so as to determine the scale of metrostations; making a choice between underground and elevated lines of metro in areas that, out of urbandistrict; optimizing the embedded depth, structural dimension and its constructing schemes of metro

Keywords: metro construction     investments     reducing    

Analytical algorithms of compressive bending capacity of bolted circumferential joint in metro shield

Frontiers of Structural and Civil Engineering   Pages 901-914 doi: 10.1007/s11709-023-0915-8

Abstract: The numerical results show that α can be specified as approximately 0.2 for most metro shield

Keywords: shield tunnel     segment joint     joint structural model     failure mechanism    

The Three ‘‘As” of the Naples Metro System

Antonello De Risi

Engineering 2018, Volume 4, Issue 2,   Pages 175-179 doi: 10.1016/j.eng.2018.03.013

Research and application of safety management dashboard for metro construction

Ding Lieyun,Zhou Ying,Chen Lijuan

Strategic Study of CAE 2011, Volume 13, Issue 8,   Pages 67-72

Abstract:

Metro construction safety is affected by many factors,such as engineeringengineering design plan, etc.This paper proposes a dashboard tool based on 3D models to control the safety of metroof the construction and risk activities intuitively and timely which improves safety management in metro

Keywords: metro construction     safety management     dashboard    

Study on Big Data-based Behavior Modification in Metro Construction

Lie-yun Ding,Sheng-yu Guo

Frontiers of Engineering Management 2015, Volume 2, Issue 2,   Pages 131-136 doi: 10.15302/J-FEM-2015037

Abstract: With the rapid development of metro construction in China, construction accidents frequently happen,This paper introduces the study on big data-based metro construction behavior modification, aiming toSecondly, the development of behavior modification system of metro construction (BMSMC) is introducedObservations at one metro construction site in Wuhan indicate that the unsafe behavior rate of modified

Keywords: big data     unsafe behavior     behavior modification     behavior-based safety (BBS)     unsafe behavior rate    

Acoustic fault signal extraction via the line-defect phononic crystals

Frontiers of Mechanical Engineering 2022, Volume 17, Issue 1,   Pages 10-10 doi: 10.1007/s11465-021-0666-y

Abstract: In this paper, 2D line-defect phononic crystals (PCs) consisting of periodic acrylic tubes with slitThe defect band, namely, the formed resonance band of line-defect PCs enables the incident acoustic waveThe effectiveness of weak harmonic and periodic impulse signal detection via line-defect PCs are investigatedAll the numerical and experimental results indicate that line-defect PCs can be well used for extracting

Keywords: phononic crystals     line-defect     fault signal extraction     acoustic enhancement    

Calculations of narrow-band transimissities and the Planck mean absorption coefficients of real gases using line-by-line

Huaqiang CHU, Mingyan GU, Huaichun ZHOU, Fengshan LIU

Frontiers in Energy 2014, Volume 8, Issue 1,   Pages 41-48 doi: 10.1007/s11708-013-0292-4

Abstract: the band parameters of Soufiani and Taine, the more recent parameters of André and Vaillon, and the line-by-line

Keywords: transimissity     HITEMP     HITRAN     Planck mean absorption coefficients    

Pareto lexicographic α-robust approach and its application in robust multi objective assembly line balancing

Ullah SAIF,Zailin GUAN,Baoxi WANG,Jahanzeb MIRZA

Frontiers of Mechanical Engineering 2014, Volume 9, Issue 3,   Pages 257-264 doi: 10.1007/s11465-014-0294-x

Abstract: application of the proposed method on a simple problem of multi objective optimization of simple assembly line

Keywords: Pareto     lexicographic α-robust     assembly line balancing    

Choosing configurations of transmission line tower grounding by back flashover probability value

Dmitry KUKLIN

Frontiers in Energy 2016, Volume 10, Issue 2,   Pages 213-226 doi: 10.1007/s11708-016-0398-6

Abstract: However, in application to grounding of transmission line towers they are not enough to determine what

Keywords: grounding     transmission line tower     back flashover probability     FDTD method    

A fast compound direct iterative algorithm for solving transient line contact elastohydrodynamic lubrication

Jian LIU,Yuxue CHEN,Zhenzhi HE,Shunian YANG

Frontiers of Mechanical Engineering 2014, Volume 9, Issue 2,   Pages 156-167 doi: 10.1007/s11465-014-0297-7

Abstract:

A fast compound direct iterative algorithm for solving transient line contact elastohydrodynamicTwo kinds of numerical results of transient EHL line contact problems under sinusoidal excitation or

Keywords: elastohydrodynamic lubrication     transient     line contact     matrix splitting iteration method     the Thomas method    

Title Author Date Type Operation

Metro train rescheduling by adding backup trains under disrupted scenarios

Jiateng YIN, Yihui WANG, Tao TANG, Jing XUN, Shuai SU

Journal Article

The Undersea Tunnel on Qingdao Metro Line 8

Weiguo He, Peng Liu

Journal Article

A review of metro construction in China: Organization, market, cost, safety and schedule

Lieyun DING, Jie XU

Journal Article

A Discussion on Some Critical Issues of Metro Network Planning

Quan Yongshen

Journal Article

Evaluation of stray current corrosion resistance of concrete in metro construction

YANG Shucai, YANG Xu

Journal Article

On Reducing Investments of Metro Construction in China

Shi Zhongheng

Journal Article

Analytical algorithms of compressive bending capacity of bolted circumferential joint in metro shield

Journal Article

The Three ‘‘As” of the Naples Metro System

Antonello De Risi

Journal Article

Research and application of safety management dashboard for metro construction

Ding Lieyun,Zhou Ying,Chen Lijuan

Journal Article

Study on Big Data-based Behavior Modification in Metro Construction

Lie-yun Ding,Sheng-yu Guo

Journal Article

Acoustic fault signal extraction via the line-defect phononic crystals

Journal Article

Calculations of narrow-band transimissities and the Planck mean absorption coefficients of real gases using line-by-line

Huaqiang CHU, Mingyan GU, Huaichun ZHOU, Fengshan LIU

Journal Article

Pareto lexicographic α-robust approach and its application in robust multi objective assembly line balancing

Ullah SAIF,Zailin GUAN,Baoxi WANG,Jahanzeb MIRZA

Journal Article

Choosing configurations of transmission line tower grounding by back flashover probability value

Dmitry KUKLIN

Journal Article

A fast compound direct iterative algorithm for solving transient line contact elastohydrodynamic lubrication

Jian LIU,Yuxue CHEN,Zhenzhi HE,Shunian YANG

Journal Article